rfplease!
RFPlease

Government opportunity discovery and qualification for Los Angeles small businesses.

Government opportunitiesLos Angeles agenciesGovernment contracting guidesProcurement glossaryHow RFPlease worksAboutData methodologyEditorial policyCorrections
rfplease!

1057

live signals

1057

ready now

42

early RFIs

0

prime openings

Preview mode

Browse the live feed for free. Pro unlocks alerts, full summaries, and saved searches.

Alerts lockedFull summaries lockedSaved searches locked
See pricing

Tab filters

Bid status

Open bidsClosed bidsAll statuseson

Signal type

All signalsonReady to bid
Missing docs
Early RFIs
Subcontract
Reset filters
RFPLA County

Public Works/Los Angeles County

On-Call Architectural/Engineering and Support Services

To view, print, or download the Request for Proposals documents, please visit the County of Los Angeles Public Works "Do Business with Public Works" website: https://dpw.lacounty.gov/contracts/aed_rfp/ProjectDetail.aspx?project_id=BRC0000653 All posted items are on the "Do Business with Public Works" website. The County of Los Angeles Department of Public Works (Public Works) is inviting proposals from qualified firms to provide On-Call Architectural/Engineering and Support Services for various projects located throughout County of Los Angeles. This RFP consists of three categories: Category 1: Medical Projects, Category 2: General Projects, Category 3: Justice Projects. An optional virtual pre-proposal conference to answer questions concerning the project will be held on April 30, 2026, at 10:00 a.m. Attendance is optional but encouraged. Electronic proposals must be submitted either via BidExpress or USB flash drive to the Department of Public Works, 900 South Fremont Avenue, Alhambra, California 91803, Cashier's Office, located on the Mezzanine Level, on/or before 5:30 p.m., Tuesday, May 19, 2026. Proposals received after the deadline will not be accepted. Only electronic submission (via Bid Express or USB flash drive) will be accepted. If you have any questions regarding this Request for Proposals, you may contact Ms. Rori Rubio by e-mail at rrubio@dpw.lacounty.gov. Proposers must submit questions in writing and request information for this solicitation two weeks prior to the proposal due date.

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$250M

Unlock analysis

RFILos Angeles Unified School District

Los Angeles Unified School District/Los Angeles Unified School District

Best Value- RFQ- 2610074 - Marquez Charter Elementary School - JAN 2025 Fire Recovery Project

Notice is hereby given that the Board of Education of the City of Los Angeles will receive Statements of Qualifications and bids from the District's list of pre-qualified contractors to furnish all labor and material for the following: REQUEST FOR QUALIFICATIONS / BID NUMBER: 2610074 JAN 2025 Fire Recovery Project (PSA) (Best Value) at Marquez Charter Elementary School (10375311 ) . Prime contractor shall hold license in the following classification(s): “B” license required. Contractor Caused Compensable Delay (L.D.): $5000.00 per calendar day. The District’s Contract Bond Estimate is $125 ,565,000.00 .

Pro analysis lockedFit, deadline, readiness, and risk flags
RFPCity of San Diego

City of San Diego/City of San Diego

El Camino Real Half Mile to Via De La Valle

See solicitation for details.

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$66M

Unlock analysis

RFPCity of Los Angeles

Port of Los Angeles/City of Los Angeles

San Pedro Waterfront - Harbor Blvd Roadway & 22nd St Parking Lot Improvements

San Pedro Waterfront – Harbor Boulevard Roadway and 22nd Street Parking Lot Improvements Project consists of developing and redeveloping 17.5 acres of parking improvements for a total of approximately 1,900 parking stalls and roadway improvements at Harbor Boulevard (formerly known as Sampson Way) from SP Slip to 22nd Street. The 208 East 22nd Street Parking Lot Improvements and Public Access Improvements (Drawing Nos. 1-3514 and 1-3536) Project consists of demolition of the Red Car maintenance and storage facility and fisherman storage areas and other existing improvements including clearing and grubbing, grading, asphalt concrete paving, and striping; installation of site lighting and conduit for future cabling; security fencing and cameras; parking ticket dispensers, pay stations, and gate arms; cast-in-place concrete retaining walls; construction of a concrete masonry unit (CMU) restroom building with utilities; and other improvements. The Harbor Boulevard from SP Slip to 22nd Street Roadway Improvements (Drawing No. 1-3597) Project includes reconfiguration and expansion of a section of Harbor Boulevard from SP Slip to 22nd Street to include 2 travel lanes in each direction, a scenic pedestrian walkway, and pedestrian access. Improvements include demolition and removal Work; removal and relocation of existing utilities; construction of curb and gutter; grading new boulevard alignment; placing crushed miscellaneous base; cold milling existing pavement; paving; pavement markings; relocation of existing and installation of new signage; sidewalks; street trees and landscaping; lighting; site cleanup; and other improvements.

RFPLA County

Public Works/Los Angeles County

ON-CALL ENVIRONMENTAL CONSULTANT SERVICES FOR FLOOD CONTROL FACILITIES

Please go to the following link to for the RFP documents: https://dpw.lacounty.gov/contracts/aed_rfp/ProjectDetail.aspx?project_id=BRC0000660

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$24M

Unlock analysis

RFILos Angeles Unified School District

Los Angeles Unified School District/Los Angeles Unified School District

Design Build - R-26059 - San Julian Bus Garage - Electrification Project (Phase 2)

DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQs) BIDDERS ARE CAUTIONED TO CAREFULLY EXAMINE THE REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSAL (RFP) BEFORE BIDDING. Notice is hereby given that the Board of Education of the City of Los Angeles will solicit Statement of Qualifications (SOQs) and bids from the District’s list of pre-qualified contractors to furnish the design and construction for the following: BID NUMBER: R-26059 (2610097) Electrification Charging Stations Project at Sun Julian Bus Yard (10377747 ) . The anticipated budget for the design and construction, inclusive of all costs associated to the project, is approximately $22 Million. THE PROJECT WILL BE USING THE DESIGN-BUILD PROCUREMENT METHOD PERMITTED UNDER CALIFORNIA EDUCATION CODE 17250 ET. SEQ., IS FUNDED BY PROPOSITIONS WHICH WERE APPROVED BY THE VOTERS AND IS SUBJECT TO THE PROJECT STABILIZATION AGREEMENT. NON-mandatory pre-proposal meeting will be held ON MONDAY, JUNE 15, 2026, AT 10:00 A.M. (PDT), VIA TEAMS video conference . Please contact Maria Castrellon, via email, at maria.castrellon@lausd.net , no later than 11:00 A.M., Friday, June 12, 2026, to obtain the details for the video conference. RFQ documents are available for download at http://www.laschools.org/new-site/bidding-opportunities/best-value/17250 and https://portal.us.bn.cloud.ariba.com/dashboard/public/appext/comsapsbncdiscoveryui#/leads/search?anId=AN01650823748 . STATEMENT OF QUALIFICATIONS ARE DUE: no later than 11:00 a.m. local time on Tuesday, July 7, 2026 . Bidder should note that OWNER’s prequalification program has been expanded pursuant to Public Contract Code 20111.6 to include mechanical, electrical and plumbing subcontractors, holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 licenses. Bidders who will be utilizing a first-tier subcontractor to perform such specialty work must select a subcontractor from the OWNER’s List of Prequalified Subcontractors . Effective March 1, 2015, a contractor or subcontractor shall not be qualified to bid on or be listed in a bid proposal unless currently registered with the California Department of Industrial Relations (DIR). For any contract awarded on or after April 1, 2015, a contractor or subcontractor shall not engage in the performance of any contract unless currently registered with the DIR. The Los Angeles Unified School District has a Labor Compliance Program as approved by the Director of the Department of Industrial relations and the Board of Education in compliance with Section 1771.5 of the California Labor Code. Copies of the prevailing rate of per diem wages are on file at the following District office and shall be made available to any interested party on request: Facilities Support Services/Labor Compliance Program: 333 S. Beaudry Avenue, 21 ST Floor Los Angeles, CA 90017 (213) 241-4665 On February 25, 2003, the Board of Education adopted a twenty-five (25%) participation goal for Small Business Enterprise (SBE), per contract, based on the basis of award amount of funds allocated to the school construction and modernization program. This goal will be included in each construction contract. The Board reserves the right to reject any or all proposals or bids, and to waive any informality in any bid. DATED: 06/03/2026 BOARD OF EDUCATION OF THE CITY OF LOS ANGELES by Procurement Services Division.

Previous
123...177
Next

Value

$126M

Unlock analysis

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$65M

Unlock analysis

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$22M

Unlock analysis