San Pedro Waterfront - Harbor Blvd Roadway & 22nd St Parking Lot Improvements
Fit
Watch
Value
$65M
Deadline
Closed
Decide fast
Set-aside
Not specified
Opportunity brief
San Pedro Waterfront – Harbor Boulevard Roadway and 22nd Street Parking Lot Improvements Project consists of developing and redeveloping 17.5 acres of parking improvements for a total of approximately 1,900 parking stalls and roadway improvements at Harbor Boulevard (formerly known as Sampson Way) from SP Slip to 22nd Street. The 208 East 22nd Street Parking Lot Improvements and Public Access Improvements (Drawing Nos. 1-3514 and 1-3536) Project consists of demolition of the Red Car maintenance and storage facility and fisherman storage areas and other existing improvements including clearing and grubbing, grading, asphalt concrete paving, and striping; installation of site lighting and conduit for future cabling; security fencing and cameras; parking ticket dispensers, pay stations, and gate arms; cast-in-place concrete retaining walls; construction of a concrete masonry unit (CMU) restroom building with utilities; and other improvements. The Harbor Boulevard from SP Slip to 22nd Street Roadway Improvements (Drawing No. 1-3597) Project includes reconfiguration and expansion of a section of Harbor Boulevard from SP Slip to 22nd Street to include 2 travel lanes in each direction, a scenic pedestrian walkway, and pedestrian access. Improvements include demolition and removal Work; removal and relocation of existing utilities; construction of curb and gutter; grading new boulevard alignment; placing crushed miscellaneous base; cold milling existing pavement; paving; pavement markings; relocation of existing and installation of new signage; sidewalks; street trees and landscaping; lighting; site cleanup; and other improvements.
Solicitation details
Solicitation
2822
Posted
May 12, 2026, UTC
Due date
Jun 25, 2026, UTCurgent
Value range
$65,000,000 estimated value
Stage
RFP
Status
Open
Recommended move
Decide today. The deadline is inside the danger zone.
1 source document linked.
Bid readiness
✓1 source document available
✓$65,000,000 estimated value
!Deadline inside one week — qualify before committing time
Risk flags
No disqualifiers flagged by the current source summary.
Pro bid intelligence
Unlock the full decision brief.
See fit scoring, deadline pressure, set-aside signals, solicitation details, the recommended move, bid readiness, and risk flags before committing proposal time.