rfplease!
RFPlease

Government opportunity discovery and qualification for Los Angeles small businesses.

Government opportunitiesLos Angeles agenciesGovernment contracting guidesProcurement glossaryHow RFPlease worksAboutData methodologyEditorial policyCorrections
rfplease!

842

live signals

842

ready now

39

early RFIs

0

prime openings

Preview mode

Browse the live feed for free. Pro unlocks alerts, full summaries, and saved searches.

Alerts lockedFull summaries lockedSaved searches locked
See pricing

Tab filters

Bid status

Open bidsClosed bidsonAll statuses

Signal type

All signalsonReady to bid
Missing docs
Early RFIs
Subcontract
Reset filters
RFPCalifornia

Metropolitan Water District of Southern California/California

Iron Mountain Pumping Plant Interim Employee Housing Rehabilitation

The work consists of various residential improvements, including but not limited to, plumbing, carpentry, flooring, doors, windows, updating lighting and electrical components, exterior stucco patch, drywall, paint interior and exterior, fence repair, roof repair, HVAC, abatement of materials containing asbestos and lead, and other appurtenant work as directed by Metropolitan’s representative based on time and materials.

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$250K

Unlock analysis

RFPCalifornia

Metropolitan Water District of Southern California/California

Eagle Mountain Pumping Plant Interim Employee Housing Rehabilitation

The work consists of various residential improvements, including but not limited to, plumbing, carpentry, flooring, doors, windows, updating lighting and electrical components, exterior stucco patch, drywall, paint interior and exterior, fence repair, roof repair, HVAC, abatement of materials containing asbestos and lead, and other appurtenant work as directed by Metropolitan’s representative based on time and materials.

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$250K

RFPCalifornia

Metropolitan Water District of Southern California/California

Julian Hinds Pumping Plant Interim Employee Housing Rehabilitation

The work consists of various residential improvements, including but not limited to, plumbing, carpentry, flooring, doors, windows, updating lighting and electrical components, exterior stucco patch, drywall, paint interior and exterior, fence repair, roof repair, HVAC, abatement of materials containing asbestos and lead, and other appurtenant work as directed by Metropolitan’s representative based on time and materials.

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$250K

RFILos Angeles Unified School District

Los Angeles Unified School District/Los Angeles Unified School District

FORMAL 2610078 JEFFERSON HIGH SCHOOL

NEW STADIUM SCOREBOARD

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$233K

Unlock analysis

RFPCity of San Diego

City of San Diego/City of San Diego

Construction Management Services - Pump Station 2 Improvements and Modernization (PLA)

The Construction Management Professional for the Pump Station 2 Improvements and Modernization project will be responsible for providing Construction Management Resident Engineer (CMRE) services and Inspection services for the Design-Bid-Build contract for the Pump Station 2 (PS2) Improvements and Modernization project. This project includes the upgrade, rehabilitation, and modernization of Pump Station 2 (PS2). The scope of the PS2 project includes replacement of eight vertical non-clog pumps, six pump motors, six pump motor drives, eight cone valves, eight suction wedge-type gate valves, eight discharge wedge type gate valves, and concrete patching & coating for two wet wells to ensure long-term functionality of this critical Metro System facility. Other Pump Station 2 enhancements include replacement of pump fly wheels; pump supports; pump gauges, sensors, and transmitters; installation of new pump seal water supply system; architectural rehabilitation of the Mechanical Room; structural rehabilitations throughout the facility; and additional HVAC units and ductwork for the new electrical equipment. The project will require a minimum of one CMRE for a duration of approximately 1,452 construction working days plus 40 working days start-up and 80 working days for close-out. The project will also require inspection including but not limited to structural, concrete, mechanical, welding, electrical, coating, corrosion, and instrumentation and controls (I&C). Working hours will be during daytime, however some nighttime or weekend work may be required to ensure completion of the work and changes to the working hours could be required through the contract duration in order to meet specific project needs.

RFILos Angeles Unified School District

Los Angeles Unified School District/Los Angeles Unified School District

IT ProfServ RFP2054126027 Software Asset Management (SAM) LAUSD

Provide ongoing Software Asset Management services to maintain an organized and compliant program to help manage district software. The SAM solution will provide an effective system for the deployment, maintenance, utilization, and disposal of applications. DISCLAIMER: To see current solicitation documents log-in is required.

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$1

Previous
1...789...141
Next

Unlock analysis

Unlock analysis

Pro analysis lockedFit, deadline, readiness, and risk flags

Value

$6

Unlock analysis

Unlock analysis